top of page
İLETİŞİM
İletişim Bilgileri
Evka 3 Mah. 119/7 Sok. No:12 Bornova / İZMİR
tel: +90 232 375 9154, +90 232 375 9159
faks: +90 232 375 92 36
PROJELERİMİZ
ARI-ES DUVARI
İlgili Yayınlar
Güncel Gelişmeler
OVA WIND FARMWe completed all pre-construction period work items except for Environmental Impact Assessment and base map preparation/approval for Ova Wind Farm which is under operation with a total installed power of 18 MW with 8 wind turbines. | ALİAĞA WIND FARMWe completed all the pre-construction operations for Aliağa Wind Farm (19,20 MW) located in İzmir Province, Aliağa District. The capacity has been increased to 19,20 MW with additional 4 wind turbines. The wind farm is operating now. | KUZÖREN SOLAR POWER PLANTWe completed all pre-construction period work items except for base map preparation and approval for Kuzören Solar Power Plant which is under operation with a total installed power of 750 kW located in Denizli Province, Serinhisar District. |
---|---|---|
TÜRKERLER GEOTHERMAL POWER PLANTWe completed all pre-construction period work items except for Environmental Impact Assessment for Türkerler Geothermal Power Plant (24+24 MW) located in Manisa Province, Alaşehir District. | KAPIDAĞ WIND FARMWe completed all the pre-construction operations for Kapıdağ Wind Farm (28 MW) located in Balıkesir Province, Erdek District, except for the Environmental Impact Assessment. We are still conducting the pre-construction studies of the wind farm whose production capacity is planned to be increased to 34,85 MW with 3 additional wind turbines . | BANDIRMA WIND FARMWe completed all the pre-construction operations for Bandırma Wind Farm (50 MW) located in Balıkesir Province, Bandırma District, except for the Environmental Impact Assessment. The capacity has been increased to 50 MW with additional 5 wind turbines. The wind farm is operating now. |
KUYUCAK WIND FARMWe completed all the pre-construction operations (all institutional permits, expropriation process, base map preparation and approval, landownership permits, zoning plan approval) for Kuyuacak Wind Farm (50,10 MW with 23 wind turbines) located in Manisa Province, Kırkağaç District. | ÇATALTEPE WIND FARMWe completed all pre-construction period work items except for Environmental Impact Assessment for Çataltepe Wind Farm extension project of which total installed power increased from 16 MW to 27,50 MW with additional 5 wind turbines located in Balıkesir Province, Havran District. The wind farm has been under operation. | KELTEPE WIND FARMWe completed all the pre-construction operations for Keltepe Wind Farm Extension Project (29,90 MW) located in Balıkesir Province, Susurluk District. The capacity has been increased to 29,90 MW with additional 3 wind turbines. The wind farm is operating now. |
SAYALAR WIND FARMWe completed all the pre-construction operations for Sayalar Wind Farm (54,20 MW with 38 wind turbines) located in Manisa Province, Sayalar District, except for the base map preparation and approval. | YILMAZ WIND MEASUREMENT MASSWe completed the all institutional permits for wind measurement mast located in İzmir Province, Menemen District. | ÇATALBÜK WIND FARMWe completed all pre-construction period work items for Çatalbük Wind Farm which is under operation with a total installed power of 25,20 MW with 25 wind turbines. |
BOZYAKA WIND FARMWe completed all pre-construction period work items except for base map preparation and approval for Bozyaka Wind Farm located in İzmir Province, Aliağa District. The wind farm is under operation with a total installed power of 19,70 MW with 8 wind turbines. |
bottom of page